Fit for the future
-
2 Plant concept
-
3 The heat exchangers for the waste heat power...
-
4 3D planning – Cross section through the clinker...
-
5 3D planning – plan and realization (right)
-
6 The central air suction duct on the grate cooler...
-
7 The new burner platform with a view towards the...
-
8 Time schedule
-
9 View of the planetary cooler – the demolition...
-
10 The kiln hood is arriving – in the background,...
-
11 The preassembled structure of the grate is...
-
12 Construction situation before Christmas
-
13 The clinker cooler has been hoisted in and the...
-
14 The heat exchangers for the heat recuperation...
-
1 3D Planning – cross section. The heat transfer...
Within the scope of a project subsidised by the German Federal Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU), the kiln system at the Rohrdorf cement plant was modernised. A waste heat recovery system was among. Extraction of the mid-air from the grate cooler results in a further reduction of heat loss and an increased degree of heat recuperation.
1 Introduction
You can find out more in the Issue