LOESCHE GMBH

New construction project with three vertical roller mills in Egypt

Loesche is involved in the new construction of a large cement plant in Egypt with three vertical roller mills. The end customer is the Egyptian Cement for Cement Projects Management S.A.E. The planned new plant is located nearly 500 km south of Cairo in Sohag.

The Loesche scope of delivery includes a raw material mill with a capacity of 540 t/h of cement raw meal, a cement mill with an output of 350 t/h of clinker as well as a coal mill with an output of 45 t/h.

The cement mill for this order is equipped with the COPE drive (Compact Planetary Electric Drive). The COPE drive concept was developed especially for powerful vertical roller mills with over 6 MW of power by Loesche together with the Renk company. Six or eight water-cooled cage rotor induction engines drive the grinding table of the mill through a planetary gear. The motor pinion can be engaged or disengaged.

The motors are also individually replaceable, which makes the COPE drive very maintenance-friendly. Moreover the mills can be further operated in case of a breakdown of one or several motors until the operation of a replacement is permissible. This results in a higher plant availability.

The Chinese Chengdu Design & Research Institute (CDI) functions as the general contractor for the project and belongs to the renowned Sinoma Group, which is specialized in the planning and construction of cement plants. CDI has not only successfully worked together with Loesche in Egypt, but on many occasions worldwide, such as for the cement producer El Arish, the lines 3 & 4 as well as the Beni Suef Cement Plant, where before the end of 2017, six new production lines for cement clinker will be formed, each with a daily capacity of 6000 t, for which Loesche will soon provide 18 new vertical roller mills.

www.loesche.com

Related articles:

1-2/2016 LOESCHE GMBH

Loesche Technology for cement plant in Angola

Sinoma International ordered Loesche’s complete grinding series for the cement plant of Nova Cimangola S.A. in Luanda/Angola. These will be the first Loesche vertical roller mills in Angola. The...

more
06/2013

Loesche Mills for the No. 1 cement group in India

In a consortium with KHD, Loesche has succeeded in ­India once again with an order placed by ACC/Holcim. The decision of Holcim was made for the Loesche favorite and state-of-the-art vertical roller...

more
5/2014 GERMANY

Renk and Loesche agree on exclusivity for COPE gearbox

As cement producers have different requirements for drives in vertical roller mills, the latest developments in the area of drive train technology offer a wide range of options. Especially in the case...

more
1-2/2015 EGYPT

The first VRMs for cement grinding to El Arish Cement

El Arish Cement of Egypt is extending the clinker production capacity of its existing cement plant and will add two new lines with a clinker production capacity of 5500 tpd each. The company already...

more
05/2013

Mills and euqipment for Silifke

The new cement works Silifke in the South of Turkey, approximately 100 km west of Mersin, will be equipped with state-of-the-art and energy efficient Loesche vertical roller mills. With a capacity of...

more