SCHENCK PROCESS EUROPE GMBH

Two Russian cement works converted to Smart Factory standard

The innovative dispatch automation system LOGiQ from Schenck Process is continuing its success story. In recent weeks, the Darmstadt-based specialist in measuring and process technology has implemented the technology at two Russian locations operated by the Swiss construction material group Lafarge­Holcim Ltd: the cement works at Ferzikovo and ­Voskresensk. This has resulted in the plants being upgraded to the Lafarge-Holcim Group’s Smart Factory standard.

Intelligent and flexible networking

LOGiQ networks are the local intelligence of matched hardware and software modules for logistics solutions in the bulk materials and cargo industry. The system automates processes and flows of goods at all points between ordering and dispatch. At the same time, the software controls information flowing from and to production processes and commercial systems and interactions with the people and machines involved. If the customer’s requirements change, the system can be flexibly adapted to new needs.

At Ferzikovo, the LafargeHolcim Group is currently engaged in a major investment project for the Russian market. The plant has three incoming and outgoing scales as well as 11 loading stations for loose cement and two bag loading stations. Schenck Process converted the parking lot with registration, the incoming and outgoing scales and all loading points for fully automatic, unmanned operation. Self-service terminals for registration and weighing were installed in the entrance and exit areas. In the loose loading area, a LOGiQ loading terminal including the ­DISOMAT Tersus weighing electronics with Profibus interface to the PLC and ultrasonic sensors were installed. In Voskresensk the conversion work included the parking lot with registration, incoming and outgoing scales, three loading scales and one loading point for packaged goods.

Successful through lasting partnership

Commissioning passed off smoothly and quickly at both locations. Schenck Process ensured smooth delivery operations at both plants throughout the installation and commissioning process. Incoming silo trucks for loose loading – more than 300 daily in Ferzikovo alone – continued to be processed around the clock.

Throughout the entire project, both partners benefited from the experience gained through previous successful collaboration. Since 2013, Schenck Process has implemented the LOGiQ dispatch automation system at various plants belonging to the Swiss construction ma­terial group, including 18 cement works in Eastern Europe.

www.schenckprocess.com

x

Related articles:

Issue 2016-1-2 SCHENCK PROCESS

Holcim Deutschland benefits from partnership with Schenck Process when retrofitting three cement factories

Schenck Process has upgraded three cement factories to smart factory standard in less than three months. This is the next successful step in the long-standing, excellent customer relationship between...

more
Issue 2013-7-8

Comprehensive logistics solution for HeidelbergCement

Schenck Process has equipped another HeidelbergCement plant with its LOGiQ® automated logistics solution. The plant, which went into operation in June 2012, is located in Tula/Russia, around 150 km...

more
Issue 2014-7-8 SCHENCK

New CEO

Andreas Evertz took over as CEO of Schenck Process, Darmstadt/Germany, on 05.05.2014. He will lead the company in close coordination with the two other Managing Directors Mike Petkovich and Wolfgang...

more
Issue 2018-11 SCHENCK PROCESS GROUP

Schenck Process acquires Process Components Ltd

Schenck Process announced the acquisition of Process Components Ltd (”PCL”) and its subsidiaries – including the Kemutec Group Inc. in the US – with its well-known brands kemutec, KEK-Gardner,...

more
Issue 2020-9 LAFARGE ZEMENTWERKE GMBH

New CEO at Lafarge Austria

Lafarge Zementwerke GmbH – a company of the LafargeHolcim Group – has had a new CEO since 01.07.2020. Berthold Kren (49), previously responsible for Geocycle Asia at LafargeHolcim, succeeds José...

more