• Facebook
  • LinkedIn
Zement Kalk Gips
  • Home
  • Kiln
 LafargeHolcim Mannersdorf plant Lead picture Lafarge/Klettermayer; all other authors
Lead picture Lafarge/Klettermayer; all other authors
 Flowsheet of the kiln line in Mannersdorf before modification
 Preheater incl. separate-line calciner before modification
 3D Model of the new system with new in-line calciner
 Scheme of the A TEC Post Combustion Chamber (PCC)
 Flow pattern modelled by CFD in the PCC
 Top view of the calciner (PCC) in Mannersdorf
 Flowsheet of the kiln line after modification
 Installation of the platforms
 Start of installation of the steel structure for the new calciner
Mehr erfahren Sie in

ZKG 4/2018

Mehr erfahren Sie in

ZKG 4/2018

Ressort:  Process
Abonnement Inhaltsverzeichnis
TEXT Dr. Stefan Kern1, Deputy Managing Director, Ing. Daniele Sabadelli1, Project Manager,         Dipl.-Ing. Bernhard Köck2, Optimisation Manager         1A TEC Production and Services GmbH, Gödersdorf/Austria         2Lafarge Zementwerke GmbH, Mannersdorf/Austria
  • Facebook
  • X Twitter
  • XING
  • LinkedIn
News
  • “Best CO2 Utilisation 2025”: Celebrating Pioneering Innovation in Carbon Capture and Utilisation Technologies
Content Management by InterRed
Bauverlag.de