Climate protection and energy efficiency – focal challenges for cement research

6. International VDZ Congress 2009, Düsseldorf/Germany (30.09.-02.10.2009)

The 6. International VDZ Congress, held in late September 2009, was attended by more than 500 specialist participants (Fig. 1). The proceedings were opened by the VDZ chairman, Gerhard Hirth, of Schwenk Zement KG, whose speech of welcome was followed immediately by the opening paper, presented by Björn Stigson (Fig. 2), President of the World Business Council for Sustainable Development (WBCSD), and summarizing the current situation in CO2 emissions trading. Fundamental reports then focused on the complexity of new cements designed specifically to meet market needs, the state-of-the-art in...

Related articles:

Issue 11/2018 WO 2018/147909 A1

Early strength enhancement of cements

(22) 25.10.2017 (43) 16.08.2018 (57) A method of making a cement composition, comprising grinding a cement clinker and a strength-enhancing agent, thereby producing a hydraulic cementitious powder,...

more
Issue 7-8/2015 EP 2 868 635 A1

Cement clinker cooler and method for cooling cement clinker

(22) 29.10.2013 (43) 06.05.2015 (57) White cement clinker can be ­efficiently produced using a kiln 10 for sintering cement clinker and ­unloading the cement clinker from the kiln 10 to a clinker...

more
Issue 01/2012

AMCC: Raising capacities at Alexandria plant

The Amreyah Cement Company (AMCC)/Egypt – a member of the Cimpor Group – also awarded Polysius France a turnkey modernisation order. This involves the upgrading of kiln line 2 and conversion of the...

more
Issue 4/2019 US 2019/0039949 A1

Process and device for cement clinker production

(22) 24.09.2018 (43) 07.02.2019 (57) In a process for the production of cement clinker, in which raw meal is preheated in a preheater (3) using the hot exhaust gases from a clinker kiln, and the...

more
Issue 10/2010

Polysius constructs a 3000 t/d cement kiln line in Brazil

Polysius has been contracted by CIA. de Cimento Itambè/Brazil, to build a new 3,000 tpd cement clinker production line at the Balsa Nova plant, near the city of Curitiba in southern Brazil. One...

more