Clinker grinding in Indonesia with the tried and tested Loesche mill type LM 53.3+3 CS
For the PT Semen Baturaja cement plant, the customer Tianjin Cement Industry Design & Research Institute Co., Ltd. has placed an order for two type LM 53.3+3 CS Loesche mills for clinker grinding. Each of the tried and tested mills for grinding clinker is designed with a capacity of 175 t/h and material is ground to a fineness of 3400 Blaine. Every mill is fitted with a gearbox with a power of 4200 kW. The lead time for the main components of the mill is nine months and the gearboxes are supplied within 12 months. The commissioning of both vertical roller mills is planned for the end of 2016.
The operator of the cement plant PT, Semen Baturaja, is very satisfied with the type LM 46.2+2 CS Loesche mill currently in operation, which was delivered in 2009, and is also happy with the service in relation to the mill. In 2013, Loesche GmbH established the subsidiary company PT Loesche Indonesia with an office in Jakarta so that the valued customer PT Semen Baturaja and all other Indonesian cement plants can be optimally serviced from there.
//www.loesche.com" target="_blank" >www.loesche.com:www.loesche.com