Improving cement plant performance with O&M contracts

Decreasing capacity utilization rates and financial constraints are reasons for the ongoing performance improvements of cement plants. However, when technical solutions are getting more complex and when operational know-how is limited, O&M contracts can be the solution. This article will look at this approach more closely.

1 Introduction

Cement plants differ in plant age, size, technology, automation, fuel supply, operational and maintenance requirements and other issues. Generally, more CapEx is spent on the latest technology (Figure 1), to reduce operational and maintenance costs. Sometimes it is very difficult to compare individual plants. Plants with several kiln lines (Figure 2), which use identical raw materials, can compare the efficiency of the individual kiln lines more effectively than an isolated plant with just one kiln line. The best performing plants often perform best in only one or two parameters,...

Related articles:

Issue 5/2019 US 2019/0071351 A1

Process and plant for manufacturing cement in the oxyfuel mode

(22) 31.03.2017 (43) 07.03.2019 (57) Process for operating a cement or lime plant comprising a cement or lime kiln and a calciner, wherein heat is generated by combustion of a fuel in the kiln and/or...

more
Issue 6/2016 THYSSENKRUPP INDUSTRIAL SOLUTIONS AG

thyssenkrupp to supply new cement clinker production line to HeidelbergCement

thyssenkrupp Industrial Solutions has received a contract from Heidelberg­Cement AG to supply a new cement clinker production line. The 4500 t/d facility will be built at the Schelklingen plant in...

more
Issue 11/2016 FLSMIDTH

FLSmidth wins new operation and ­maintenance contract in Egypt

FLSmidth has signed another contract with Wadi El Nile Cement Company (WNCC) for operation and maintenance of their cement plant located approximately 120 km south of the Egyptian capital, Cairo. The...

more
Issue 11/2012

New clinker plant and cement grinding facility

In Togo, HeidelbergCement is constructing a new 250 million US$ clinker plant with an annual capacity of 1.5 million t in the town of Tabligbo, some 80 km north-east of the capital of Lomé. In...

more

New clinker plant and cement grinding facility

In Togo, HeidelbergCement is constructing a new 250 million US$ clinker plant with an annual capacity of 1.5 million t in the town of Tabligbo, some 80 km north-east of the capital of Lomé. In...

more