The Lafarge Iligan preheater debottlenecking project is one of the company’s up-grading projects and focuses on lower investment and good result of the existing facility of the product line. As the required kiln shutdown period is limited, a good preparation and tight cooperation with the owner is necessary. All related modification was finished within only 22 days.

1 Introduction

Lafarge Iligan Cement is located on the North shore of Mindanao Island, Philippines, about 10 km from Iligan City. The cement plant has a dry process with a capacity of 1400 t/d clinker. The existing four stage SP type of preheating system is quite old and needed an up-grade to reach the new planned clinker output of 1600 t/d. The preheater system consists of a double string for C2 and C4 and a single string for C1 and C3.

Nanjing Kisen International Engineering Co., Ltd. signed the contract on 01.06.2013 to undertake the work related to the debottlenecking project on a turnkey...

Related articles:

Issue 2017-9 A TEC GROUP

Alternative fuel system for kiln riser duct firing at CRH Slovakia

In 2017 A TEC and CRH Slovakia have installed an alternative fuel system for kiln riser duct firing in Tur?a nad ­Bodvou/Slovakia. The Tur?a nad Bodvou ­cement plant has already operated a SAF...

more
Issue 2019-4 US 2019/0039949 A1

Process and device for cement clinker production

(22) 24.09.2018 (43) 07.02.2019 (57) In a process for the production of cement clinker, in which raw meal is preheated in a preheater (3) using the hot exhaust gases from a clinker kiln, and the...

more
Issue 2016-4 US 2016/0052822 A1

Process and device for ­cement clinker production

(22) 08.04.2014 (43) 25.02.2016 (57) In a process for the production of cement clinker, in which raw meal is preheated in a preheater (3) using the hot exhaust gases from a clinker kiln, and the...

more
Issue 2018-3 HUMBOLDT WEDAG GMBH

KHD installs Pyrorotor Calciner Technology for highly flexible alternative fuel burning in Austria

Cologne-based Humboldt Wedag GmbH has been awarded an EPC contract by Rohrdorfer Cement Group for the kiln line modernization at its cement plant operations in Gmunden/Austria. The kiln modification...

more
Issue 2017-12 WO 2017/158076 A1

Cement kiln tertiary air damper

(22) 16.03.2017 (43) 21.09.2017 (57) The present invention relates to a cement kiln tertiary air duct damper unit (1) for a tertiary air duct (3) between a clinker cooler and a calciner of a clinker...

more