Process Know-how

Refurbishment of the electrical installation
of an EKG 5A shovel excavator

Summary: A shovel excavator of the type EKG 5 was refurbished using a favourably-priced concept. One advantage was that the use of modern electronic current converter technology enabled already-installed DC motors to be retained. This was made possible by dynamic power-factor compensation. Spare parts are cheap and will have a long availability. The fully-digitized current converter and its drive control assure high functional reliability. Comprehensive diagnosis functions are incorporated into the current converter and can be parameterized and documented by PC. The capital costs for the EKG 5 retrofit are approx. 50 % of the cost of new acquisition of a comparable hydraulic excavator.

1  Introduction
Karsdorf is a community in the German state of Saxony-Anhalt. In 2006 ABB acquired there an order for the electrical refurbishment of an EKG  5 shovel excavator. The order came from Lafarge Zement – one of the leading cement manufacturers in Germany. The company offers a large range of different types of high quality cements. It is of utmost importance to the customers of Lafarge that they can rely on an unchanging high quality standard of the products they buy. So the manufacturer has to make sure that all production processes run as they should, smoothly and without failure....

Related articles:

Ground work with the Hyundai R800LC-9 all-electric excavator

Deisl Concrete in Austria, with headquarters located in Hallein 25 km south of Salzburg right on the Tauern motorway, has always been a very innovative company, and currently employs approximately 90...

more
Issue 2009-12

Gearless mill drive order

ABB has received an order for the first gearless mill drive (GMD) system ever to be installed in an Indian manufacturing plant. The order was placed at the end of October 2009, by the Indian cement...

more
Issue 2014-10 SIEMENS

The titans of open-pit mines

Again and again, the size of the excavator bucket has driven the development of the haul truck, and in turn the size of the pit determines the development of the excavator bucket. For economic...

more
Issue 2009-02 Companies & Products

Airflow with cost-saving potential

The cement plant belonging to the Volan Cement Plant Group in Inner Mongolia has changed over the blowers of three of its production lines to variable-speed operation. The result: By using frequency...

more
Issue 2013-11

Siemens delivers drive systems for clinker production

The cement producer Thai TPI Polene Public Company Limited has placed an order with Siemens for engineering and supply of the power distribution system and drives for the new clinker production line...

more