Search

Your search for "" found 5635 Hits

Issue 4/2016 AUMUND GROUP⇥HALL/STAND B2.143 and HALL/STAND C2.245

Efficient solutions for the conveying and storage of problematic bulk materials

For the last 25 years Aumund Fördertechnik has exhibited at every edition of ­Munich’s bauma. In 2016 participation in trade fairs remains paramount for the Aumund Group. All three product...

more
Issue 4/2016 AIXPROCESS GMBH⇥HALL/STAND 3-045

Innovative cyclone and simulation technology from aixprocess

aixprocess has longstanding expertise in particulate systems with the particle simulation software “Barracuda Virtual Reactor” for fluidized systems and such with high solids loadings. Our...

more
Issue 4/2016 MALVERN INSTRUMENTS⇥HALL/STAND 1-357

Malvern/Bio-Rad collaboration makes particle ­identification quicker and easier

A collaboration between Malvern Instruments Ltd (Malvern/UK) and Bio-Rad Laboratories, Inc. (Hercules, California/USA) has delivered new analytical tools for the rapid identification of unknown...

more
Issue 4/2016 BAR PNEUMATISCHE STEUERUNGSSYSTEME GMBH⇥HALL/STAND 4-146

Valve control via directly top-mounted components

Pneumatic rack-and-pinion actuators, which control the operation of the process in combination with other components, such as pilot valves and positioners, have proven their worth in process...

more
Issue 4/2016 WO 2016/024328 A1

Combustion device

(22) 12.08.2014 (43) 18.02.2016 (57) [Problem] To provide a combustion device for a pellet fuel, the device being able to suppress the accumulation or generation of clinker in a grate part and improve...

more
Issue 4/2016 WO 2016/025290 A1

Process for reducing the level of chloride in chlorosilane ­direct process hydrolyzed substrate

(22) 06.08.2015 (43) 18.02.2016 (57) The present invention relates to a process for providing a low-chloride hydrolyzate comprising contacting an acid or base hydrolyzed substrate of a chlorosilane...

more
Issue 4/2016 WO 2016/019247 A1

Systems and methods for monitoring cement quality in a cased well environment with integrated chips

(22) 31.07.2015 (43) 04.02.2016 (57) A well monitoring system may provide a plurality of integrated chips dispersed in cement surrounding a well casing. Each of the integrated chips may provide energy...

more
Issue 4/2016 WO 2016/015832 A1

Method for grinding cement clinker

(22) 16.07.2015 (43) 04.02.2016 (57) Method of grinding cement clinkers comprising at least two kinds of clinker phases with differing grindability, comprising the steps: – feeding the cement...

more
Issue 4/2016 US 2016/0052822 A1

Process and device for ­cement clinker production

(22) 08.04.2014 (43) 25.02.2016 (57) In a process for the production of cement clinker, in which raw meal is preheated in a preheater (3) using the hot exhaust gases from a clinker kiln, and the...

more
Issue 4/2016 US 2016/0052167 A1

Gypsum board manufacturing method and manufacturing device

(22) 24.03.2014 (43) 25.02.2016 (57) As a lower forming plate 8, a forming plate having: a lower plate main body 10 constituted from an electrically conduc­tive material; and a lower embedded...

more

Ihre Suche nach "" :

5405 Treffer in "AT Minerals"

8595 Treffer in "Bundesbaublatt"

8064 Treffer in "Betonwerk + Fertigteil-Technik"

7437 Treffer in "bauhandwerk"

1108 Treffer in "Brandschutz"

1124 Treffer in "Computer Spezial"

5094 Treffer in "dach+holzbau"

14699 Treffer in "Deutsche BauZeitschrift"

5498 Treffer in "FACILITY MANAGEMENT"

10690 Treffer in "Kälte Klima Aktuell"

5640 Treffer in "metallbau"

1376 Treffer in "recovery"

11622 Treffer in "SHK Profi"

12910 Treffer in "tab - Das Fachmedium der TGA-Branche"

11962 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

1984 Treffer in "tunnel"

5635 Treffer in "Zement Kalk Gips"

3412 Treffer in "Ziegelindustrie International"