US 2016/0117637 A1

Apparatus and method for tracking and managing cement, ­concrete, or other deliveries

(22) 19.06.2015

(43) 28.04.2016

(57) A method implemented by an electronic device includes receiving information associated with an order of one or more time-sensitive orders for construction materials. The method also includes displaying, based on the information, a time when the order is to be delivered by, a current location of a vehicle associated with the order, and a total amount of con­struction material ordered and ­delivered for the order. An electronic device includes a controller configured to receive information associated with an order of one or more time-sensitive orders for construction materials. The electronic device also includes a display unit configured to display, based on the information, a time when the order is to be delivered by, a current location of a vehicle associated with the order, and a total amount of construction material ordered and delivered for the order. The method and electronic device are used to track and manage various deliveries.

(71) Martin Marietta, Inc., Raleigh, NC (US)

Related articles:

Issue 5/2019 US 2019/0054655 A1

Cement sintering device and cement sintering method

(22) 24.05.2018 (43) 21.02.2019 (57) The present disclosure provides a cement sintering device and a cement sintering method. The cement sintering device comprises an emitting module configured to...

more
Issue 10/2017 US 2017/0184509 A1

Identification of material type and condition in a dry bulk ­material storage bin

(22) 28.10.2014 (43) 29.06.2017 (57) A method includes optically interacting a bulk material or powder stored in a storage bin with an integrated computational element („ICE“) configured to modify...

more
Issue 11/2015 US 2015/0246849 A1

Cement clinker production system

(22) 20.12.2012 (43) 03.09.2015 (57) The cement clinker production system includes: a first supplying section configured to supply a sulfur source and a fluorine source of mineralizer; a second...

more
Issue 04/2012

Gypsum transports optimized

REINERT Logistic GmbH & Co. KG, was tasked with initiating a transport optimization program for its client, Lafarge Gypsum (part of the global Lafarge Group), and ordered the advanced vehicle routing...

more
Issue 7-8/2017 US 2017/0120252 A1

Method and air-swept vertical mill for grinding hot, wet raw ­material and also channel-like segment

(22) 02.06.2015 (43) 04.05.2017 (57) The invention relates to a method for milling hot and wet raw materials, in particular cement clinker, in a vertical airflow mill (1), to a vertical airflow mill...

more