US 2018/0194680 A1

Process and device for separating
off a volatile component

(22) 05.03.2018

(43) 12.07.2018

(57) A process and device separate off a volatile component from the off-gases in cement clinker production. Raw materials for cement clinker production are passed through a preheater with heat exchange with the off-gases and are then burnt in a rotary kiln. Owing to the heating in the preheater, the volatile component bound in the raw materials is vaporized and separated off. A first raw material stream having a relatively high concentration of the volatile component is applied to a first line of the preheater and a second raw material stream having a lower concentration of the volatile component is applied to a second line. The volatile component is separated off from the first substream of the off-gases. The first raw material stream heated to a temperature of at least 250° C. with the first substream of the off gases in the first line is combined with the second raw material stream.

(71) Scheuch GmbH, Aurolzmünster (AT); W & P Zement GmbH, Klein St. Paul (AT); A TEC Holding GmbH, Kerms (AT)

x

Related articles:

Issue 2015-10 US 2015/0225292 A1

Process and device for separating off a volatile component

(22) 02.09.2013 (43) 13.08.2015 (57) A process and device separate off a volatile component from the off-gases in cement clinker production. Raw materials for cement clinker production are passed...

more
Issue 2017-11 PL2986579 (T3)

Process and device for cement clinker production

(22) 08.04.2014 (43) 29.09.2017 (57) Summary of the corresponding patent WO2014170729 (A1): In a cement clinker production process in which raw mix is preheated with use of the hot exhaust gases from...

more
Issue 2019-4 US 2019/0039949 A1

Process and device for cement clinker production

(22) 24.09.2018 (43) 07.02.2019 (57) In a process for the production of cement clinker, in which raw meal is preheated in a preheater (3) using the hot exhaust gases from a clinker kiln, and the...

more
Issue 2021-8 WO 2021/180723 A1

Cooler for cooling bulk material, in particular cement clinker

(22) 09.03.2021 (43) 16.09.2021 (57) The present invention relates to a cooler (10) for cooling bulk material (12), in particular cement clinker, having a cooling-gas space (14), through which a...

more
Issue 2022-4 ES2903251 (A1)

Control of volatiles in cement clinker manufacturing processes (cold bypass)

(22) 30.09.2020 (43) 31.03.2022 (57) Reduction of volatile emission during direct progress in cement clinker manufacturing processes, by removing or purging the volatile contents in gaseous currents...