Search

Your search for "" found 5761 Hits

Issue 06/2014 thyssenkrupp industrial solutions

PREPOL Step Combustor (SC) – a simple combustion system for solid alternative fuels

Operational experience shows that waste has to be pre-processed in a mechanical plant before its derived fuel can be used in a cement plant with standard equipment. The fuel must be comminuted to 20-50 mm to entrain into the gas stream and totally burnout within the short retention time in the calciner or at the kiln end. Alternatively, solid waste derived fuel ...

more
Issue 06/2014 FLSMIDTH PFISTER

Production cost saving by using coarse alternative fuels

Many cement plants in Europe began burning alternative fuels in the main burner many years ago. Because the fuel must be transported pneumatically into the main burner and the particle residence time in the kiln at the main burner is quite short, the fuel must be fully prepared. Independent of the feeding, a gravimetric dosing device is mandatory and its accuracy should increase with the substitution rate. ...

more
Issue 06/2014 ONESTONE CONSULTING S.L.

New developments in Brazil’s cement ­industry

1 Introduction Over the last decade income inequality in Brazil has dropped significantly. An estimated 40 million people were pulled out of poverty. Fast growth of the middle class now drives...

more
Issue 06/2014 AIXERGEE PROCESS OPTIMIZATION

Burning alternative fuels in cement kilns

1 Suitability of cement kilns for the combustion of secondary fuels Compared to other high energy-intensive production processes of cement clinker burning process allows a relatively high potential...

more
Issue 06/2014 UNITHERM CEMCON

The Pneumo-Deflector

For the last two decades Unitherm Cemcon has implemented several tools in the burner to influence the distribution of solid recovered fuel (SRF) particles in the flame. For the total use of the...

more
Issue 06/2014 SIEMENS

Energy efficiency through transparency

1 Introduction The manufacturing process of the world’s most widely used building material is very energy intensive. From the crushing of raw material to the grinding of what is known as clinker...

more
Issue 06/2014 INDIA

FLSmidth MAAG Gear expands in India

Cement consumption in India has been increasing steadily and is expected to continue to rise further in the future. To comply with this trend, FLSmidth MAAG Gear inaugurated its first assemble and...

more
Issue 06/2014 PANalytical

Version 4.0 of the proven HighScore (Plus) software is launched

PANalytical, one of the world’s leading suppliers of analytical X-ray equipment and software has launched a new version of HighScore (Plus), their proven powder diffraction analysis software. A...

more
Issue 06/2014 AUMUND Fördertechnik

Know-how of Besta & Meyer, Louise and WTW ­under one roof

Effective 01.05.2014, Aumund Förder­technik assumed the spare parts services of the Maschinenfabrik Besta & Meyer in Saarland/Germany. In this way, Aumund follows several strategic goals...

more
Issue 06/2014 SCHADE Lagertechnik GmbH

Schade moves and gets set for further growth: “Engineering – Made in Germany”

The reason for the relocation is an increased demand for office space due to the company’s continued growth. “When we came to Herne with a staff of about 30 people back in 2002, some of our...

more

Ihre Suche nach "" :

5652 Treffer in "AT Minerals"

8877 Treffer in "Bundesbaublatt"

8295 Treffer in "Betonwerk + Fertigteil-Technik"

7620 Treffer in "bauhandwerk"

1162 Treffer in "Brandschutz"

1185 Treffer in "Computer Spezial"

5302 Treffer in "dach+holzbau"

15105 Treffer in "Deutsche BauZeitschrift"

5681 Treffer in "FACILITY MANAGEMENT"

11066 Treffer in "Kälte Klima Aktuell"

5848 Treffer in "metallbau"

1524 Treffer in "recovery"

11921 Treffer in "SHK Profi"

13282 Treffer in "tab - Das Fachmedium der TGA-Branche"

12156 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2029 Treffer in "tunnel"

5761 Treffer in "Zement Kalk Gips"

3470 Treffer in "Ziegelindustrie International"