Search

Your search for "" found 5809 Hits

Issue 01/2011

Lafarge plant Wössingen: optimally equipped for new products and alternative fuels thanks to the modernized kiln line

The main burner of the modernized kiln line at Wössingen (Fig. 1) was ignited for the first time on 20.03.2009. The new plant produced its first cement clinker only two days after the kiln start-up....

more
Issue 01/2011

Circuit high pressure grinding rolls (HPGR) in a cement grinding plant Part 2: Effect of operating parameters

1 Introduction Effects of operating parameters have been investigated by various researchers mostly through laboratory and pilot scale data ([1], [2] and [3]). Models have also been developed to...

more
Issue 09/2010

Dust collector pulse timer saves energy

IntelliPULSE™ pulse jet timer for baghouses and dust collectors reduces energy costs and offers direct connection to PLCs with user specified field bus communications such as Devicenet, Ethernet,...

more
Issue 10/2010

Laser-based online analysis of minerals

1 Introduction To ensure efficient exploitation of natural raw material deposits and their high-quality processing, many deposits, in particular those which are inhomogeneous with a complex structure...

more
Issue 01/2011

Sustainable development through continuous optimization

Lafarge operates one of Germany’s most modern cement plants in Wössingen (Fig. 1). With the changeover from the semi-dry (Lepol) process to the dry process, which was completed in 2009 after only...

more
Issue 11/2010

Modern production of building materials in the Middle East

16. Arab-International Cement Conference and Exhibition, Ras Al Khaima Exhibition Center/UAE (06.–08.12.2010)

The Middle East has developed continuously and positively during recent years, to a great extent unaffected by the global economic crisis, which also became evident by the increasing number of...

more
Issue 7-8/2010

New kiln line: phase 3*

In July 2009 the groundbreaking ceremony for a new kiln line was held at the LEUBE/Austria cement factory [1]. The aim of the modernization is to secure the cement production location, to reduce...

more
Issue 11/2010

Optimum grinding of raw materials, cement and coal

4th PFEIFFER Convention 2010, Kaiserslautern/Germany, (13.–15.10.2010)

For the 4th time, Gebr. Pfeiffer AG in Kaiserslautern, Germany, a leading manufacturer of vertical roller mills, is hosting the PFEIFFER Convention. Over 200 guests from more than 40 countries were...

more
Issue 04/2011

The New CAMSIZER XT

The quality control of fine powders in a size range from 1 µm to 3 mm can be substantially improved with the new CAMSIZER XT (Fig.): More precise and faster analysis of particle size and particle...

more
Issue 04/2011

Waste heat recovery system in India

A waste heat recovery system delivered by FLSmidth to Vicat Sagar Cements will be integrated with their new pyro line, which is also supplied by FLSmidth. The WHR system is expected to be operational...

more

Ihre Suche nach "" :

5719 Treffer in "AT Minerals"

8940 Treffer in "Bundesbaublatt"

8363 Treffer in "Betonwerk + Fertigteil-Technik"

7698 Treffer in "bauhandwerk"

1202 Treffer in "Brandschutz"

1242 Treffer in "Computer Spezial"

5390 Treffer in "dach+holzbau"

15269 Treffer in "Deutsche BauZeitschrift"

5734 Treffer in "FACILITY MANAGEMENT"

11184 Treffer in "Kälte Klima Aktuell"

5915 Treffer in "metallbau"

1556 Treffer in "recovery"

11983 Treffer in "SHK Profi"

13375 Treffer in "tab - Das Fachmedium der TGA-Branche"

12200 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2053 Treffer in "tunnel"

5809 Treffer in "Zement Kalk Gips"

3501 Treffer in "Ziegelindustrie International"