US 2021/0302099 A1

Cooler for cooling hot bulk material and method for preventing grate riddlings in a cooler

(22) 06.09.2019

(43) 30.09.2021

(57) A cooler for cooling bulk material such as cement clinker may include a stationary aeration grate that is for receiving the bulk material is passably by a flow of cooling gas, a conveyor unit having conveyor planks that are disposed above the aeration grate and that for transporting the bulk material are movable in a reciprocating manner in a conveying direction and counter to the conveying direction, a seal assembly that prevents grate riddlings and is attached to the stationary aeration grate, and a drive element that drives the conveyor planks and extends through the stationary aeration grate. The seal assembly may lie against the drive element, and spacing between the seal assembly and the drive element may be adjustable. Further, a method for preventing grate riddlings in a cooler may involve in the event of wear decreasing the spacing between the seal assembly and the drive element.

(71) thyssenkrupp Industrial Solutions AG, Essen (DE), thyssenkrupp AG, Essen (DE)

(73) thyssenkrupp Industrial Solutions AG, Essen (DE), thyssenkrupp AG, Essen (DE)

x

Related articles:

Issue 7-8/2020 WO 2020/053098 A1

Cooler for cooling hot bulk material and method for preventing grate riddlings in a cooler

(22) 06.09.2019 (43) 19.03.2020 (57) The invention relates to a cooler (10) for cooling bulk material, in particular cement clinker, comprising: a stationary ventilation bottom (12) for holding the...

more
Issue 3/2021 WO 2021/028287 A1

Cooler for cooling bulk material

(22) 05.08.2020 (43) 18.02.2021 (57) The invention relates to a cooler for cooling bulk material, in particular cement clinker, said cooler comprising the following components: – a supporting frame,...

more
Issue 5/2021 WO 2021/074059 A1

Cooler for cooling bulk material

(22) 12.10.2020 (43) 22.04.2021 (57) The invention relates to a method for cooling bulk material, in particular cement clinker, in a cooler (10), having the steps of: – admitting bulk material (11)...

more
Issue 7-8/2020 WO 2020/053100 A1

Cooler for cooling clinker and method for operating a cooler for cooling clinker

(22) 06.09.2019 (43) 19.03.2020 (57) The present invention relates to a method for operating a cooler (10) for cooling clinker, in particular of a cement making plant, comprising the steps of...

more
Issue 8/2021 WO 2021/180723 A1

Cooler for cooling bulk material, in particular cement clinker

(22) 09.03.2021 (43) 16.09.2021 (57) The present invention relates to a cooler (10) for cooling bulk material (12), in particular cement clinker, having a cooling-gas space (14), through which a...

more