Search

Your search for "" found 5635 Hits

Issue 12/2011

Simulation of lime calcination in PFR kiln – Influence of energy input and lime throughput

This article presents a one-dimensional mathematical model to describe and simulate the lime calcination process in a parallel flow regenerative (PFR) lime shaft kiln. The model comprises ordinary...

more
Issue 12/2011

Positive operating experience after separator replacement

In July 2010, Phoenix Zement in Beckum optimized a grinding plant by changing the separator (see report in ZKG INTERNATIONAL 09/2010, pp. 20-23). The background to this investment by Phoenix was the...

more
Issue 12/2011

New Sales Manager

A change of personnel has occurred in the Masterflex AG sales management. On 01.10.2011, Christian Horstkötter assumed the position of Sales Manager and thus succeeds Alfons Beitz. Horstkötter has...

more
Issue 12/2011

VDMA: New Chairman

The members of the Construction Equipment and Building Material Machinery Association within VDMA e.V., the German Engineering Federation, have unanimously elected Johann Sailer (50), Managing Partner...

more
Issue 12/2011

Management team now complete

Following two years of working abroad, Klaus Hardt returned to the Allgaier Group on 1 October 2011. Together with Helmar ­Assfalg and Gerd Plettendorf, he makes up the management team for Allgaier...

more
Issue 12/2011

Correct analysis by representative sample division

A faultless and comparable analysis is closely linked to accurate sample handling. Only a sample representative of the initial material can provide meaningful analysis results. This can be achieved by...

more
Issue 12/2011

Turnkey modernisation project

Les Ciments de Bizerte/Tunisia contracted Polysius France to modernise and increase the output of a kiln line in Bizerte in order to boost its output from the present 2000 to 4000 t/d clinker. The...

more
Issue 12/2011

Troughed belt conveyor for Nordkalk

Nordkalk tasked BEUMER with a turnkey delivery of a troughed belt conveyor (Fig.) that can navigate horizontal curves for the environmentally friendly transport of limestone. An 8.7 km long troughed...

more
Issue 12/2011

Duo cell silos for Mordovcement

Mordovcement/Russia has awarded a contract to Claudius Peters for the delivery of two new cement dispatch silos to be commissioned in the early part of 2012. These cement silos form part of the new...

more
Issue 10/2011

Fly ash terminal for Moerdijk

Vliegasunie placed an order for a fly ash terminal with Claudius Peters at the beginning of 2011. A milestone was the visit to the Claudius Peters Technical Centre where a full scale silo section can...

more

Ihre Suche nach "" :

5406 Treffer in "AT Minerals"

8595 Treffer in "Bundesbaublatt"

8065 Treffer in "Betonwerk + Fertigteil-Technik"

7438 Treffer in "bauhandwerk"

1108 Treffer in "Brandschutz"

1125 Treffer in "Computer Spezial"

5094 Treffer in "dach+holzbau"

14700 Treffer in "Deutsche BauZeitschrift"

5501 Treffer in "FACILITY MANAGEMENT"

10692 Treffer in "Kälte Klima Aktuell"

5642 Treffer in "metallbau"

1376 Treffer in "recovery"

11624 Treffer in "SHK Profi"

12912 Treffer in "tab - Das Fachmedium der TGA-Branche"

11963 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

1988 Treffer in "tunnel"

5635 Treffer in "Zement Kalk Gips"

3412 Treffer in "Ziegelindustrie International"