Search

Your search for "" found 5809 Hits

Issue 07/2012

Sales ­re­organized

Since early 2012, the Sales Department of Lafarge in Germany is under the leadership of Marcel Kecke (Fig.). He was previously responsible for the management of Sales West. For the area East Klaus...

more
Issue 07/2012

Back on track

Over 900 participants attended the IEEE-IAS/PCA conference 2012 in San Antonio, Texas/USA. The 4-day conference with one day excursion to the TXI Hunter plant and the Cemex Balcones plant offered a...

more
Issue 07/2012

Gypsum is at the core of a sustainable and ­resource-efficient built environment

Every two years, the European Gypsum Association gathers for its congress. Besides the exchange of information between the members, the event announces the new President for his 2-year leadership....

more
Issue 07/2012

NEA fine-grinding system for dolomite marble

GEOMIN invested in a dolomite marble grinding system from NEUMAN & ESSER GmbH Mahl- und Sicht­systeme. The new grinding system is part of a long-term strategy aimed at developing new applications for...

more
Issue 07/2012

Measurement of flue gases in rotary kilns of cement plants

The Germany industry produces 80 million t of carbon dioxide each year, 37 % of this alone by cement and lime producers according to the European Oeko-Institut e.V. The aim of reducing these...

more
Issue 07/2012

Electrical engineering and automation for a ­cement terminal at the port of Malmö/Sweden

As a general contractor, Ibau Hamburg led the construction of a cement terminal for Cementa HeidelbergCement Group at the port of Malmö/Sweden (Fig. 1). The multi-chamber silo, which is fed by a...

more
Issue 07/2012

Comparison of simulated and measured ­temperature profiles in PFR and RCE kilns

Temperature profiles in the axial direction of one industrial PFR kiln and two RCE kilns were measured using thermocouples. The results show that the temperatures in the PFR kiln fluctuate with...

more
Issue 07/2012

Extraction management optimisation with TLS and 3D modelling

1 Introduction Operating mining companies need to face today’s market challenges in both economic and ecologic ways. The cost-effective production combined with a sustainable extraction management...

more
Issue 07/2012

Optimization of the thermal substitution rate – Part 2

The first part of the article in issue 5/2012 dealt with the basics and case study I. It was shown, how MI-CFD modelling can be used to understand the thermo-fluid dynamics of a calciner. In Part II a...

more
Issue 07/2012

Integrated management system

On 23.05.2012 Christian Knell, General Manager Germany, received the certificate for the integrated management system of HeidelbergCement from Roland Glauser (Fig. left), Managing Director of the...

more

Ihre Suche nach "" :

5719 Treffer in "AT Minerals"

8940 Treffer in "Bundesbaublatt"

8363 Treffer in "Betonwerk + Fertigteil-Technik"

7698 Treffer in "bauhandwerk"

1202 Treffer in "Brandschutz"

1242 Treffer in "Computer Spezial"

5390 Treffer in "dach+holzbau"

15269 Treffer in "Deutsche BauZeitschrift"

5734 Treffer in "FACILITY MANAGEMENT"

11184 Treffer in "Kälte Klima Aktuell"

5915 Treffer in "metallbau"

1556 Treffer in "recovery"

11983 Treffer in "SHK Profi"

13375 Treffer in "tab - Das Fachmedium der TGA-Branche"

12200 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2053 Treffer in "tunnel"

5809 Treffer in "Zement Kalk Gips"

3501 Treffer in "Ziegelindustrie International"