Search

Your search for "" found 5684 Hits

Issue 4/2022 ROHRDORFER

Rohrdorfer is first cement plant in Germany to build CO2 separation plant

Germany’s first CO2 separation plant for cement production is currently being built on the premises of the Rohrdorf cement plant. The pilot project is a milestone for a climate-neutral cement...

more
Issue 4/2022 TAIHEIYO CEMENT CORPORATION | TOKYO GAS CO., LTD

Feasibility study to synthesize methane from cement derived CO2 for supply through city gas pipelines

Taiheiyo Cement Corporation and Tokyo Gas Co., Ltd. have agreed to jointly conduct a comprehensive study toward realizing a decarbonized society. As a first step in the collaboration, the two ...

more
Issue 4/2022 MAERZ OFENBAU AG | GRUPO CALIDRA

How to save 20% electric energy in Maerz PFR lime kilns

Maerz Ofenbau AG and Grupo Calidra successfully installed and commissioned a high-pressure radial fan on a Maerz PFR lime kiln, thereby saving 20% of electric energy consumption compared to roots...

more
Issue 4/2022

The difference between perceiving and understanding

Recently I listened to a radio program where the host was interviewing a professor for meteorology on climate change. At one point he committed: “Yes – ok – I understand that obviously all those ...

more
Issue 4/2022 SIEMENS AG

For decades now, there has been an excellent cooperation on many topics between Siemens’ cement department and the trade journal ZKG Cement Lime Gypsum. The competent and technically researched...

more
Issue 4/2022 KIRCHDORFER ZEMENTWERK HOFMANN GESELLSCHAFT M.B.H.

Commissioning of the “burnout section” at the Kirchdorf cement plant

On May 13, 2022, the new “burnout section” was officially put into operation. With an investment of € 9.5 million, the Kirchdorf cement plant once again defends its claim to be one of the...

more
Issue 4/2022 MVW LECHTENBERG PROJEKTENTWICKLUNGS- UND BETEILIGUNGSGESELLSCHAFT MBH

MVW Lechtenberg & Partner builds first refuse-derived fuel production plant in Saudi Arabia

The Duisburg-based company MVW Lechtenberg & Partner has been active in the Kingdom of Saudi Arabia since 2010. In various consulting projects, among others, within the framework of the “Mandatory...

more
Issue 4/2022 WO2022076931 (A1)

Particle size distribution of cement in high temp kiln

(22) 09.10.2021(43) 14.04.2022(57) There is provided high temperature furnaces, calcining, pyrolysis and other high temperature manufacturing processes, composition rearrangements, and equipment....

more
Issue 4/2022 WO2022074552 (A1)

Method and system for bypass gas handling in a cement kiln system

(22) 05.10.2021(43) 14.04.2022(57) The invention relates to a bypass system for bypass gas handling in a cement kiln system in a plant for manufacture of cement clinker, said plant for manufacture of...

more
Issue 4/2022 WO 2022/053986 A1

Cement kiln bypass emissions reduction

(22) 09.09.2021(43) 17.03.2022(57) A bypass system and a process for reducing the formation of ammonium sulphate and ammonium bisulphate in off gases that have exited a cement rotary kiln utilized in...

more

Ihre Suche nach "" :

5497 Treffer in "AT Minerals"

8703 Treffer in "Bundesbaublatt"

8151 Treffer in "Betonwerk + Fertigteil-Technik"

7525 Treffer in "bauhandwerk"

1143 Treffer in "Brandschutz"

1148 Treffer in "Computer Spezial"

5190 Treffer in "dach+holzbau"

14777 Treffer in "Deutsche BauZeitschrift"

5557 Treffer in "FACILITY MANAGEMENT"

10809 Treffer in "Kälte Klima Aktuell"

5689 Treffer in "metallbau"

1432 Treffer in "recovery"

11748 Treffer in "SHK Profi"

13060 Treffer in "tab - Das Fachmedium der TGA-Branche"

12040 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

2003 Treffer in "tunnel"

5684 Treffer in "Zement Kalk Gips"

3431 Treffer in "Ziegelindustrie International"